The Nyasoso water project

–  Re-habilitation of the sedimentation Tank
–  Re-habilitation of the existing storage tank
–  Repairs of leakages along the pipelines and the construction of the filtration unit.
–  Evaluation by Nyasoso Cultural and Development Association and OSRI.


2nd Stage:

• Construction of the 40m3 storage tank and connection to the main line
 Evaluation and provisional  handing over.
Training of technical team for the repairs and maintenance of the water scheme will be done during the execution of the project and later on in a workshop and the class room.
A quarterly  monitoring programme will be put in place by OSRI and the techinical team to assure smooth running of the scheme during one year before final handing over to Nyasoso Cultural and Development Association(NCDA)

21 thoughts on “The Nyasoso water project”

  1. This is the right webpage for anybody who wishes to understand this topic. You realize so much its almost tough to argue with you (not that I really will need to…HaHa). You certainly put a fresh spin on a topic which has been discussed for ages. Excellent stuff, just wonderful!

  2. The plan to train a technical team during repairs to the sedimentation tank caught my attention. My best friend and I found through KnowUsWell that she plans every detail while I improvise, so I wondered: has the quarterly monitoring programme begun, and is the filtration unit running smoothly?

  3. It is great to see the emphasis placed on long-term sustainability here, especially incorporating technical training for local maintenance alongside the infrastructure repairs. Having a quarterly monitoring period before the final handover should make a huge difference in ensuring the new storage tank and filtration systems continue serving the Nyasoso community reliably.

Leave a Reply

Your email address will not be published. Required fields are marked *

Powered By WordPress | FT Charity NGO