The Nyasoso water project

-  Re-habilitation of the sedimentation Tank-  Re-habilitation of the existing storage tank-  Repairs of leakages along the pipelines and the construction of the filtration unit.-  Evaluation by Nyasoso Cultural and Development Association and OSRI. 2nd Stage: • Construction of the 40m3 storage tank and connection to the main line Evaluation and provisional  handing over.Training of technical team for the repairs and...

Powered By WordPress | FT Charity NGO